How a building gets made, properly.
Six stages. Zero guesswork.
Every stage ends with a drawing you approve and a cost you know — so there are no surprises once concrete is poured.
- 01Week 1
Listen & survey
A conversation about how you live, followed by a survey of the plot: levels, orientation, trees, neighbours, road and soil.
- 02Weeks 2–4
Zoning & concept
Vastu-aware zoning diagrams, sun-path study and two to three concept options in plan, section and 3D massing.
- 03Weeks 5–8
Design development
The chosen concept is refined — elevations, materials, structure and services — with photoreal views to approve.
- 04Weeks 8–14
Approvals & drawings
Permission drawings for TS-bPASS, then a complete working-drawing set with schedules and a priced BOQ.
- 0510–16 months
Build
Construction with milestone checks, weekly photo reports and architect site visits — or full turnkey delivery.
- 06Day 1 onward
Handover
Snag-free handover, as-built drawings, maintenance guide and warranty support.
Fixed fees, per stage.
Concept
Survey, zoning, sun study, 2–3 concept options, 3D massing.
Approvals
Permission drawing set, area statements, submission support.
Working drawings
Full construction set, schedules, structure & MEP coordination, BOQ.
Site
Architect site visits, quality checks, bill verification — or full turnkey.
Process questions.
Most architects charge either a percentage of construction cost (commonly 4–10% for full architecture services) or a per-sq-ft design fee. G&G Associates quotes a fixed fee per stage — concept, approvals, working drawings, site — so you always know what each step costs.
Site study, Vastu-aware planning, 3D design, approval drawings, structural/MEP coordination, working drawings and regular site visits. Interiors, landscape and turnkey construction can be added under the same team.
Design and approvals typically take 2–4 months. Construction of a G+1 house takes about 10–12 months; add roughly 2 months for each additional floor and for luxury finishes.
Yes. We prepare permission drawings to Telangana building rules and support submission through TS-bPASS, including revisions requested by the authority.